Spent some more time working on the airplane last night and today. Probably 6 hours of actual work. Finished drilling all the holes in the skin. Drilled all the stringer holes to a #30 hole size. Removed the skin again to trim to a better fit, deburr and back drill a couple holes. Deburred and smoothed the edges with scotchbrite pads. While it was off I decided to prime all the mating surfaces. Then I got lucky because a package came from aircraft spruce. another $200 spent on clecos, avex rivets, a rivet squeezer, a blind dimple die, and something else I can't think of off hand. Because of that I was able to prime and rivet several brackets to bulkhead D and E, and the stiffeners to bulkhead D
0 Comments
Your comment will be posted after it is approved.
Leave a Reply. |
AuthorHello I'm Adam Hied, 31 years old and I am slowly building a hummelbird Archives
November 2020
|